Front french door installation, window install completion, and electrical work.

Framing of the bathroom, along with electrical rough ins for the 2x4 framed wall




Vitruvian roof completion as well as exterior grade plywood completion. The peel-n-stick roofing membrane was also applied. A little bit of electrical and plumbing work.


The second day of the VBS envelope going up!

Flat-pack construction at its finest.


Click on the link to see a neat time lapse of the process!

Click on the link to see a neat time lapse of the process!

Click on the link to see a neat time lapse of the process!

Click on the link to see a neat time lapse of the process! We used 2" rigid XPS and brought it part way up the stem wall to limit thermal bridging.

Click on the link to see a neat time lapse of the process! We used PEX tubing and almost 200' of run for the EcoFab project.

Click on the link to see a neat time lapse of the process! Our average slab depth is right around 6 inches. We were targeting 5 inches, but compaction of the decomposed granite and sand led to a slightly thicker slab, resulting in a slightly higher cost, but more thermal mass!